The content below was prepared by J. Jack Kurki-Fox and edited by Barbara Doll, Julie Leibach, and Jonathan Page.

Major storms have exposed glaring vulnerabilities to riverine flooding in many N.C. Coastal Plain communities.

Riverine flooding imperils life, health and livelihoods. It also threatens transportation infrastructure. Road closures and flooding can severely affect the movement of vital goods and services, with crippling effects on local economies and emergency response.

In effort to characterize flooding problems in the coastal plain and to identify mitigation strategies, North Carolina Sea Grant and NC State University’s Biological & Agricultural Engineering Department have collaborated with the N.C. Department of Transportation (NCDOT), N.C. Emergency Management (NCEM), NC State University’s College of Design, the University of North Carolina at Chapel Hill, the Environmental Defense Fund and local governments.

This website summarizes the team’s findings and provides an overview of the resources available for coastal plain communities to increase their resilience to riverine flooding.

Map of the Neuse River basin

The Neuse River Basin in North Carolina. Map courtesy of the Lower Neuse River Basin Association

Major Floods

Since 1999, three hurricanes — Floyd, Matthew and Florence — caused billions of dollars in damage in eastern North Carolina, primarily due to major flooding in the coastal plain river basins of the Neuse, Cape Fear, Lumber, Cashie and Tar-Pamlico rivers (Table 1).

These hurricanes set many records for rainfall, river stage and discharge across the coastal plain, and the floodwaters remained for weeks in the hardest-hit areas. For example, riverine flooding after Hurricane Matthew persisted for two weeks in some areas (NCEM, 2017).

Storms like these appear to be part of a larger trend over the last four decades. Since the 1980s, the frequency, duration and intensity of North Atlantic hurricanes have all increased, particularly the frequency of Category 4 and 5 storms (Walsh et al., 2014).

Table 1. Recent major flood events in eastern North Carolina.

STORM YEAR RAINFALL (inches)*  DAMAGE (billions) FEMA DISASTER COUNTIES FATALITIES
Florence 2018 25-35 $17.0 28 40
Matthew 2016 18-20 $4.8 45 28
Floyd 1999 17-20 $9.4 66 51

*Office of the Governor (2018)

Back to Top

Transportation Impacts

The flooding impacts on transportation infrastructure and networks pose major problems for public services and emergency response.

Flooding closed more than 1,760 roads during Hurricane Matthew and more than 2,500 roads during Florence, according to the N.C. Department of Transportation Statewide Operations Center.

Short-term road closures occurred because of standing water and overtopping from streams. Meanwhile, road washouts that required repairs or complete reconstruction led to long-term closures. These impacts were not limited to local roads. Indeed, interstates including Interstate 40 and Interstate 95 were closed for more than a week after Hurricane Matthew, and again after Hurricane Florence.

Major interstate closures severely impair emergency service response and restrict the movement of essential supplies and services to critical areas. These closures also negatively affect the state and regional economy by slowing the movement of tens of millions of dollars in goods and services around the state and along the East Coast.

After Hurricane Florence, Wilmington was effectively cut off as all major roads, including I-40, leading to the city were submerged. In response, airlifts and resupplies by sea were considered.

Back to Top

Future Risks

In the last four decades, hurricane intensity, duration and frequency have all increased (Walsh et al., 2014). This trend is expected to continue as the Atlantic Ocean warms and the atmosphere stores more moisture (US EPA, 2016)

In addition to increasing overall hurricane strength, warming trends make rapid intensification, as observed with Hurricane Michael in the Gulf of Mexico, more likely (Ting et al., 2019), potentially reducing the timeframe for preparation and evacuation.

Recent research also indicates that hurricanes are moving slower, as observed with Harvey, Florence and Dorian (Kossin, 2018). More sluggish tropical storms increase the likelihood of extreme amounts of rainfall (that is, greater than a 1,000-year event, such as the rainfall that Florence produced, which exceeded 35 inches in Elizabethtown), and therefore the risk that more catastrophic riverine flooding will occur in the future.

In addition to stronger hurricanes, the amount of precipitation that falls during heavy storms (largest 1% of events) has increased 27% over the last 60 years in the Southeast.

This trend towards more intense rainfall events is expected to continue in a warming climate (Walsh et al., 2014).

Not only is the risk of major riverine flooding increasing, but the potential for more frequent flash floods on smaller streams is growing as well. Higher intensity storms are projected to increase inland flooding as a result of heavy runoff by up to 40% by 2050 in North Carolina (Walsh et al., 2014).

Back to Top

Improving Resilience

Resilient Routes | Design Standards | River Crossings | Natural Infrastructure | Floodplain Buyout | Floodplain Ordinances

RESILIENT ROUTES

In response to prolonged closures of U.S. Highway 70, I-40 and I-95, the concept of “resilient routes” has emerged. A resilient route is a transportation corridor designed to resist damage and remain open during extreme flooding in order to provide access to critical areas.

Upgrading all roads inundated during extreme events is not financially or technically feasible. Strategically identifying and upgrading transportation routes that experience minimal flooding and that will enable evacuation, emergency response, post-event access and transfer of goods and services represents a more cost-effective, logical and systematic approach.

Existing problem areas along these routes would be designed to be resilient to extreme events (e.g., 500-year or 1,000-year event). Meanwhile, other roads or river crossings would be allowed to flood and potentially close during extreme events.

In urban areas where there are numerous stream crossings that flood, the less used, redundant crossings could be eliminated to reduce future maintenance and risk of ecological impacts, structural failure or loss of life. In some instances, this approach could reduce upstream flooding caused by flow obstruction from severely undersized stream crossings.

Below are examples of resilient routes in Smithfield, Goldsboro and Kinston.

Exmaple of resilient routes in Smithfield. Credit: N.C. Sea Grant/NC State Department of Biological & Agricultural Engineering

Example of resilient routes in Smithfield. Credit: N.C. Sea Grant/NC State Department of Biological & Agricultural Engineering

Example of resilient routes in Goldsboro. Credit: N.C. Sea Grant/NC State Department of Biological & Agricultural Engineering

Example of resilient routes in Goldsboro. Credit: N.C. Sea Grant/NC State Department of Biological & Agricultural Engineering

Examples of resilient routes in Kinston. Credit: N.C. Sea Grant/NC State Department of Biological & Agricultural Engineering

Example of resilient routes in Kinston. Credit: N.C. Sea Grant/NC State Department of Biological & Agricultural Engineering

IMPROVING DESIGN STANDARDS

Design standards for roadways and river crossings are based on risk calculated from historical rainfall and streamflow observations.

For example, many NCDOT stream crossings on secondary roads are designed for a storm with a 25-year return period. That return period does not mean that a given crossing will be overtopped only once in 25 years. Rather, a 25-year return period refers to an event that has a 4% probability of occurring in any given year, based on historical observations for that location.

Over a longer period, the chance of the storm occurring increases. Over a 30-year timeframe, for instance, there is a 71% chance of a 25-year event occurring and overtopping the road (see Table 1).

Table 1. Return period and probability of occurrence.

Return Period (years) Annual Probability of Occurrence (%) Probability of occurrence in 30-year time span (%)
10 10 96
25 4 71
50 2 46
100 1 26
500 0.2 6

 

However, as storm severity increases (Walsh et al., 2014), the amount of rainfall for a given return period may have a higher probability of occurrence today than in the past.

For example, historical data for Goldsboro indicate that 7.2 inches of rainfall in 24 hours has a 4% chance of occurring in a given year — in other words, that amount of rainfall has a 25-year return period. But with the trend towards more intense rainfall, this event may have an annual probability of occurrence that is substantially higher than 4%.

Florence, Matthew and Floyd rainfall accumulations were in the range of 100-to-1,000-year return periods, depending on the location. Roadway and stream crossing design standards may need to be modified to adjust to a new level of risk as the climate changes. Some potential modifications to design standards include:

RIVER CROSSINGS

An illustration of a bridge modeling scenario. There are three panels labeled A, B, and C. A. Historical condition: open floodplain prior to road and bridge construction. B. Existing condition: Embankments constructed in the floodplain and bridge across the river. C. Scenario tested: Embankments removed and bridge extended to span floodplain.

Figure 1: Illustration of Bridge Modeling Scenario. A. Historical condition: open floodplain prior to road and bridge construction. B. Existing condition: embankments constructed in the floodplain and bridge across the river. C. Scenario tested: embankments removed and bridge extended to span floodplain.

The perception that many bridges exacerbate upstream flooding is common among eastern North Carolina communities. As part of two research projects, extension staff used hydraulic models to evaluate the impacts of bridges on upstream water level.

Bridges over the Neuse River in Smithfield, Goldsboro, Kinston and Craven County and over the Cashie River in Windsor were evaluated. The impact of the bridges on upstream water surface elevation was evaluated by modifying the river crossings (i.e., increasing the capacity by removing the floodplain embankments and increasing the bridge deck span (see Figure 1) or raising the bridge deck elevation) and comparing the model results to the existing condition.

The model results indicated that substantially increasing the capacity of the crossings (by a factor of 10 or more in most cases) would have minimal impact on the water surface elevation upstream. For most of the river crossing the change in water surface upstream was less than 1 foot, and often less than a half foot for the Matthew-scale event. This minimal reduction in water surface was attributed to several factors:

Learn more about the bridge modeling project.

NATURAL INFRASTRUCTURE

Natural infrastructure is landscape features — forests, wetlands, floodplains, riparian buffers — that provide benefits to the environment and society. In North Carolina, government, academic and nonprofit groups are discussing how natural infrastructure can be expanded to provide water storage and potentially mitigate flooding.

A recent modeling study conducted by NC State University indicated that strategic implementation of natural infrastructure on the landscape can provide benefits. Researchers modeled two scenarios evaluating natural infrastructure in two watersheds:
(1) reducing runoff though increased infiltration and storage on the landscape and
(2) stream restoration to increase floodplain conveyance area

For the first scenario, the team considered two methods:

Results indicated that peak discharge could be reduced by 20 to 30% in a 30-square-mile watershed for the most intensive implementation scenario for the 100-year event. The change in water surface elevation ranged from 0.5 to 2 feet. These results verify the potential for natural infrastructure to reduce flooding.

Read the full study.

In a smaller, more developed and extremely flood-prone watershed, reach-wide stream restoration with floodplain expansion was modeled along a straightened, armored stream (see Figure 2). The results indicated that neither road crossing improvements nor stream restoration alone will substantially reduce flooding. Rather, a combination of both approaches is necessary to achieve substantial flood reduction benefits. For this particular project, benefits could be realized for the 100-year and greater events.

Read the journal article on the work

North Carolina Sea Grant and NC State’s Biological and Agricultural Engineering Department also worked with several partners and led a multidisciplinary, inter-institutional effort to evaluate the flood reduction potential of natural Infrastructure. The team evaluated large-scale implementation of natural infrastructure measures to increase water storage capacity and reduce flooding in the middle Neuse River Basin.

Opportunity mapping, hydrology and water quality modeling for implementation of flood control wetlands, reforestation and water farming were first completed for three sub-watersheds: Little River, Bear Creek, and Nahunta Swamp. The team then extrapolated the results to the other sub-watersheds of the middle Neuse Basin.

Learn more with this video: Evaluating Nature Based Solutions for Mitigating Riverine Flooding in Eastern North Carolina.

Top: Concrete walls armoring Big Ditch in Goldsboro, North Carolina. Bottom: Workers demolish a house on property acquired though the FEMA HMGP in Lumberton.

Figure 2, top: Concrete walls armoring Big Ditch in Goldsboro, North Carolina.
Figure 3, bottom: Workers demolish a house on property acquired though the FEMA HMGP in Lumberton.

FLOODPLAIN BUYOUT

Among the resilience measures discussed here, buyouts of flood-damaged and flood-prone properties is the only practice that guarantees that future losses are avoided.

Funding for property buyouts is allocated through FEMA’s Hazard Mitigation Grant Program (HMGP) and through some local governments that fund their own buyout programs. Following a major disaster, FEMA allocates HMGP funds to the states. The state and local government can then identify flood-damaged properties that are eligible for buyouts.

The property owners can elect to participate in the program, which provides funding based on pre-disaster market value. FEMA covers 75% of the cost of acquisition through the HMGP, while the state or local government covers the remaining 25%.

After properties are acquired through the grant program, the local government assumes ownership, and the structures are demolished (see Figure 3). Redevelopment is then restricted to open-space uses (FEMA, 2018). The buyout process is not always easy, requiring coordination between property owners, local and state governments, and FEMA, and can take years to complete (Weber and Moore, 2019).

In North Carolina, over 5,000 buyouts have been completed since the mid-1990s, most as a result of damage caused by hurricanes Fran and Floyd. As of December 2019, nearly 650 properties damaged by hurricanes Matthew and Florence had been acquired, with more expected (Table 2).

Table 2. HMGP Buyouts in North Carolina

HURRICANE BUYOUTS
Fran 1,146a
Floyd >3,000b
Matthew (to December 2019) 472c
 Florence (to December 2019) 172c

aGlavovic and Smith (2014); bFEMA (2009); cNCEM ( 2019a, 2019b)

In addition to preventing future losses, areas where buyouts occur can be repurposed to provide important ecosystem services such as water storage or wildlife habitat. Buyout areas can also be converted into community amenities such as parks, greenways and athletic fields.

FEMA HMGP grants can also be secured by local governments to help homeowners raise the elevation of flood-damaged structures or relocate structures to higher ground. Over 400 structures were elevated following Hurricane Fran (Glavovic and Smith, 2014). Through buyout and elevation efforts, North Carolina communities have avoided hundreds of millions of dollars in potential losses (ReBuild NC, 2017).

IMPROVING FLOODPLAIN ORDINANCES

The most influence municipalities can exert over floodplain management is through their floodplain management ordinances.

Recent research by NC State and the University of North Carolina at Chapel Hill revealed that there is very little variation in ordinance language throughout the state, and even across the country. Ordinances are typically based on standard boilerplate language that satisfies the minimum requirements set by FEMA and the National Flood Insurance Program (NFIP). This approach has led to increased or uncontrolled development in some coastal plain communities. From 2001 to 2016, development in the 100-year floodplain increased by an average of 17% in Smithfield, Goldsboro and Kinston.

As storm frequency and intensity are projected to increase, modifying the language of floodplain ordinances is a relatively simple, low-cost action municipalities can take to improve their resilience to storms and prevent future damage.

Potential modifications include further restricting development in the 100-year floodplain, increasing the minimum required freeboard above base-flood elevation, and modifying the regulatory floodplain. These steps can reduce future property damage and potentially prevent loss of life.

Actions like these may be particularly important given the impacts of climate change. For example, a recent modeling study by NC State University’s Department of Biological & Agricultural Engineering indicates that the elevation of the 100-year flood could increase by 2 to 5 feet along the Neuse River in eastern North Carolina by 2100.

Given the likelihood of more severe storms, prohibiting developing within the 500-year floodplain and considering elevation restrictions that place all structures a safe distance above the anticipated 500-year flood level is advisable.

Below are two case studies that illustrate modifications that municipalities can implement to improve resilience to future floods.

1. Cedar Falls, Iowa
After recurrent destructive floods in the 1990s and then again in 2008, Cedar Falls modified their floodplain ordinances to limit future damages by ensuring that future development is resilient to major flooding.

Cedar Falls made several modifications that exceeded the minimum FEMA standards. Some of the major changes include:

The Cedar Falls floodplain ordinance is one of the most protective in the nation. The ordinance, combined with an aggressive buyout strategy, is intended to prevent high-risk development, reduce future damages and increase long-term resilience.

2. Charlotte and Mecklenburg County, North Carolina 
Charlotte-Mecklenburg Stormwater Services (SWS) has undertaken an extensive effort to enhance their floodplain maps to account for future conditions.

Charlotte-Mecklenburg SWS’s maps include a “community floodplain” and a “community floodway” that extend beyond the FEMA floodplain and floodway in many locations. The “community” zones take into account future land use changes in the watershed and supersede the FEMA maps for regulatory purposes.

Louisville, Kentucky, implemented a similar approach using flood maps that account for fully developed conditions.

The Charlotte-Mecklenburg and Louisville examples illustrate how forward-thinking municipalities can increase their resilience by planning for future conditions, thus minimizing risk.

Back to Top

Forecasting and Planning

There are several free tools available that municipalities can access to help them stay abreast of severe storm events and potential associated flooding before and during extreme events, and to help them better understand, communicate and plan for future risks.

Southeast River Forecasting Center

The Southeast River Forecasting Center (SERFC) provides five-day forecasts for river stage and discharge at 34 locations in North Carolina. The forecasts are based on the output from a complex regional model that considers rainfall and combines watershed runoff and river flow. View the forecasts.

National Weather Service Products

The National Weather Service (NWS) provides many important tools to the public. For example, it provides flood alerts across a range of platforms.

Flood alerts are based on two levels: watches and warnings. More information regarding the NWS flood hazard alerts can be found on this NWS page.

National Weather Service flood alert definitions

Flood Inundation Mapping and Alert Network (FIMAN)

The Flood Inundation Mapping and Alert Network (FIMAN) is a tool developed by NCEM to map flood extents and possible damages in real time at stream gauges. It provides flood inundation limits (that is, the areal footprint of the flooded area) and damage estimates at 232 gauges operated by the U.S. Geological Survey and NCEM.

Using modeling and elevation data, FIMAN relates the river stage measured at a stream gauge to the extent and depth of flooding for an area 1 to 2 miles upstream and downstream from the gauge. The extent and depth of flooding is then related to the locations of structures in order to estimate damages.

FIMAN incorporates streamflow forecasts, if available, from the National Oceanic and Atmospheric Administration’s Southeast River Forecasting Center to provide an early warning of flooding impacts. Users can sign up to receive email and text alerts for specific locations when the river reaches certain flood levels.

The mapping tool also provides current weather radar and a flood risk rating (e.g., normal, minor flooding, moderate flooding, etc.) and trends in river water elevation (i.e., constant, rising, falling) for all gauge locations. Learn about the FIMAN tool.

Floodplain Maps and Risk Assessment Tools

The North Carolina Floodplain Mapping Program is one of the most advanced floodplain mapping programs in the country. Its N.C. Flood Risk Information System (FRIS) website provides access to FEMA floodplain maps across the state for the floodway — 100- and 500-year boundaries — where available.

The site also provides tools to assess risk and estimate the cost of damages, as well as possible mitigation measures. A tool is available to estimate the cost of flood insurance for a given location, too.

Most floodplain maps from the FRIS website can be exported in the form of PDF maps of GIS compatible formats.

Back to Top

References

American Rivers. (2017). American Rivers Dam Removal Database. figshare.

Casey, M., Lieb, D. A. (2019). North Carolina No. 2 In Risky Dams Where Failure Could Kill. Retrieved December 6, 2019.

Doll, B. A., Line, D. E., Page, J., Youssef, M., Negm, L., Tian, S. (2018). Cashie River and Town of Windsor Flood Mitigation Study. Raleigh, NC.

FEMA. (2009). Remembering Floyd: 10 Years Later. Retrieved November 27, 2019.

FEMA. (2018). FACT SHEET: Acquisition of Property After a Flood Event. Retrieved November 27, 2019.

Glavovic, B. C., Smith, G. (2014). Adapting to climate change: lessons from natural hazards planning. Springer Science & Business.

Gutmann, E. D., Rasmussen, R. M., Liu, C., Ikeda, K., Bruyere, C. L., Done, J. M., … Veldore, V. (2018). Changes in Hurricanes from a 13-Yr Convection-Permitting Pseudo–Global Warming Simulation. Journal of Climate, 31(9), 3643–3657.

Ho, M., Lall, U., Allaire, M., Devineni, N., Kwon, H. H., Pal, I., … Wegner, D. (2017). The future role of dams in the United States of America. Water Resources Research, 53(2), 982–998.

Kossin, J. P. (2018). A global slowdown of tropical-cyclone translation speed. Nature, 558, 104–107.

NCEM. (2017). Hurricane Matthew Resilient Redevelopment Plan Southeast Region. Raleigh, NC.

NCEM. (2018). Neuse River Basin Flood Analysis and Mitigation Strategies Study. Raleigh, NC.

NCEM. (2019a). Hurricane Florence Expedited Acquisitions. Raleigh, NC: North Carolina Emergency Management.

NCEM. (2019b). Hurricane Matthew Hazard Mitigation Grant Program Awards. Retrieved November 25, 2019.

Office of the Governor. (2017). NC Gov. Cooper: One Year Later: North Carolina Continues Recovering from Hurricane Matthew. Retrieved December 10, 2019.

Office of the Governor. (2018). Hurricane Florence Recovery Recommendations Building Communities Stronger and Smarter Based on Preliminary Damage and Needs Assessment. Raleigh, NC: PDF.

ReBuild NC. (2017). ReBuild NC: Hazard Mitigation Grant Program. Retrieved December 6, 2019.

Schembri, F. (2018, September 21). Testing and cleaning North Carolina’s water supply post-Florence could prove tricky. A microbiologist explains why. Science Magazine.

Schmutz, S., Moog, O. (2018). Dams: Ecological Impacts and Management. In Riverine Ecosystem Management (pp. 111–127). Springer International Publishing.

Sound Rivers. (2018). Hurricane Florence Exposes Problems with Wastewater Infrastructure – Sound Rivers. Retrieved December 4, 2019.

Ting, M., Kossin, J. P., Camargo, S. J., Li, C. (2019). Past and Future Hurricane Intensity Change along the U.S. East Coast. Scientific Reports, 9(1).

US EPA. (2016). What Climate Change Means for North Carolina. Washington, D.C.: U.S. Environmental Protection Agency.

Walsh, J., Wuebbles, D., Hayhoe, K., Kossin, J., Kunkel, K., Stephens, G., … Meteorological Office Richard Somerville, U. (2014). Our Changing Climate. Climate Change Impacts in the United States: The Third National Climate Assessment. Washington, DC: PDF revised.

Weber, A., Moore, R. (2019). Going under: Long wait times for post-flood buyouts leave homeowners underwater. New York: PDF.

Lead photo: In Kinston, floodwaters remained high from the flooded Neuse River, which crested at 14 feet above flood stage six days after Hurricane Matthew in 2016. Photo by Jocelyn Augustino/FEMA.